AC guys work to find a leak; Inverter for solar panels installed - 08 October 2009






The weather still is giving us problems - the driveway is once again a muddy mess. We are still waiting for the kitchen and laundry appliances hopefully they will come soon. Even the appliance store's distributor is having cash flow problems! But other work continues. The weather was able to hold off long enough so that the AC guys can build a platform and install the compressor. I would have liked it have it in the originally planned mechanical space outside the main bathroom but then the AC lines would have been too long. Unfortunately the AC guys have to find out why the vacuum is not holding. They suspect a nail may have pinched a line in the wall. Troubleshooting is ongoing.

At the same time the South Coast solar guys were able to install the panel racks on the roof and now they are installing the inverter. The plumber was able to to install the propane gas hot water heater.