Today we had our consulting architect, Vaugahn, join me, Ellen, and our builder, Joe. The Floorworks of Slidell shop sent a two-person team to work on the master bathroom shower. The kitchen cabinets have arrived and are being installed. Should be done within the next day or two. The painter was able to apply a color primer on all the walls. This has led to a re-evaluation of the color choices, so Ellen is re-thinking those. The outside decking made from recycled plastic called Trex has now been installed except for the portion where the screened porch is. This will allow contractors to get in and out without hurting the decking.

This weekend is a tax-free holiday so Ellen and I will shop for some lighting fixtures, etc.
A huge thunderstorm came at the end of our meeting, but luckily Joe had more gravel installed with a new culvert.

1 comment:

  1. What do you think of the Trex product for the porch decking? We are thinking of using it also and would like your feedback, pros & cons. Thanks!

    ReplyDelete