The dozer guys got to work bringing in the fill dirt. The interior portion of the lot is still a pile of debris and mud.
Saturday, February 21, 2009
Bringing in the fill dirt, 21 Feb 2009
The dozer guys got to work bringing in the fill dirt. The interior portion of the lot is still a pile of debris and mud.
Saturday, February 14, 2009
After the initial clearing of the lot, 14 Feb 2009
Subscribe to:
Posts (Atom)