I got back from one week in Japan Friday Night. Saturday morning Ellen and I went out to the house to sweep floors of all the lovebugs, dust, etc. This took about two hours. While we were there Joe's framing/carpentry crew arrived to finish the deck of the Screen Porch area. The existing Trex did not look long enough so the the crew supervisor tried to contact our builder but couldn't make contact. With nothing else to do the deck crew left.
While I was gone, the antique pine flooring was installed. Almost all of the tile flooring has now been installed with one of the master bathroom closets and the entryway yet to be finished. The shower tile work is all done as is the the guest bathroom tub surround.
Also the exterior doors have been installed (except for the master bedroom doors to the screen porch) and painted. The side railing and the main stairways are now being put in place. Next week should see the electrician installing lighting fixtures, etc.